Skip to main content
Home Materials Processes Parts Manufacturing Evidence Quality & Delivery Resources About Us
Inspection Process

Inspect the features that control acceptance.

Inspection depth depends on the order. The project should identify what must be checked, how it is measured, what records are required and which part/batch the result belongs to. A photo alone is not a dimensional report.

MaterialIdentity / traceability when required
DimensionsCritical features defined
DeliveryQuantity + packing readiness
Inspection of steel plate parts
Inspection Chain

Link each check to the requirement.

01

Requirement

Drawing, PO or agreed specification identifies the features and documents that matter.

02

Material identity

Grade/heat/batch evidence is checked where traceability or certification is in scope.

03

Dimensional checks

Critical dimensions, holes, angles, datums, flatness/straightness or other features are measured as agreed.

04

Visual / surface checks

Edge condition, burr/slag, visible damage and specified surface-preparation requirements are reviewed.

05

Quantity + identity

Part count, markings, labels and batch grouping are checked where receiving or traceability depends on them.

06

Packing readiness

Protection, packing arrangement and shipment identification are checked before dispatch when in scope.

Evidence Quality

A measurement needs context to be useful.

Nominal value, feature, instrument/method, measurement points, part/sample and acceptance band should be known before a numeric inspection claim is reused on the website.

Project-specificOne passed part or batch does not become a site-wide tolerance promise.
Record-linkedReports should belong to the correct drawing revision, project and batch.
Redacted for public useCustomer, drawing and order-sensitive information must be removed before a record becomes public evidence.
Review dateCapability and document examples need ownership and review status so stale proof is not treated as current.
Request a Quote

Tell us what your receiving team will check.

Put the critical dimensions, documents, surface condition, traceability and packing expectations into the RFQ so the inspection plan can match them.